faith3468 faith3468
  • 10-11-2022
  • Business
contestada

A manufacturing firm makes a production run of 3,750 pieces. each piece is 78.30 millimeters long. the cost of material per meter of length is $2.40. allowing 10% for waste and scrap, the material cost for the 3,750 pieces is?

Respuesta :

Otras preguntas

| (Type an integer, proper fraction, or mixed number.) I
Which among the following are solution of the equation 2x+3y=8a) x=0,y=5b) x=3,y=2c) x=-5,y=6d) x=-1,y=-2​
Choose the best description of a joint probability.
Connect the red scare 1919 to present day? Please help
Defining the authority of the Federal government was difficult for Washington because - a. He was against starting the new country in the first place b. He beli
Examine China's predicted economic activity on the below table captured in February 2022. As of that date, which of the following terms would have best describ
Help me I don’t understand please
can somebody help w this paper please
____A theory that explains that our sense of self results from the reflection of who we think we see by observing the treatment and behaviors of others towards
ano ano ang mga tungkulin ng prayle sa kolonya at papel ng prayle sa lipunan