a contractor is mixing concrete and mixed 3 parts concrete and 9 parts water. How much water is needed for 12 parts concrete?

Respuesta :

sakie329 sakie329
  • 12-12-2018

Answer:

36 parts water

Step-by-step explanation:

3/9 = 1/3 = for every 1 part concrete, it's 3 parts water.

12/x = 1/3; x = 36

so, 12 x 3 = 36

Answer Link

Otras preguntas

NEED HELP ASAP <3 Some consider Chinua Achebe the __________ of African literature. A.) father B.)destroyer C.)stepchild D.)only writer
would the sentence "does this mean no one should go to college? of course not" be pathos
How did Civil Wars drawings and photos affect Americans?
A gerund is a verb that acts as a. a noun. b. an adjective. c. an adverb. d. a preposition
what does red and blue make
An individual who disagrees or has a difference of opinion is referred to as a:
Constantly moving in a cycle between the athmosphere and the soil is water.True?False?
tell a sentence for the word requirement
The number on the bottom of a fraction is called the A. product. B. numerator. C. denominator. D. divisor.
A glass marble factory produces 4.5 * 10^4 marbles in 1,800 minutes. What is the factory's unit rate of production in marbles per minute? Write the answer in sc