If 4 people can stain a deck in 2 days, how many people would be required to stain the deck in only 1 day?

Respuesta :

juju3911
juju3911 juju3911
  • 10-05-2016
8 people could stain a deck in one day.
Answer Link
littlemojo101
littlemojo101 littlemojo101
  • 10-05-2016
the answer to this is 8
Answer Link

Otras preguntas

Janitor supply produces an industrial cleaning powder that requires 40 grams of material at $0.10 per gram and .25 direct labor hours at $12.00 per hour. overhe
according to this diagram what is tan 67 It's a right triangle facing left. hypotenuse: 13 opposite:5 adjacent: 12 The angle to the far left is 23 degrees, the
Which statement from "Ain't I a Woman?" is an example of pathos, or an appeal based on emotion?
What is the range of the function y=x^2
Central america (connecting north america and south america) is a narrow strop of land that joins two larger areas known as:
a number is divided in the ratio 5:9, If the first part is 35, find the number.
What is the correct name for a 9-sided polygon?
. What is the mass, in grams, of a sample of 7.83 × 1024 atoms of helium (He)?
What does riparian mean? A. Riparian means ripe with agriculture B. Riparian means to have or be near water sources C. Riparian means ancient or respected D. Ri
As you learned in the Cuba tutorial, thousands of people, young and old, are willing to risk their lives at the chance to make more money, find a job, or seek p