jojothesavage1254 jojothesavage1254
  • 10-03-2020
  • Mathematics
contestada

A road crew can replace 1/30 miles of road rack hour. They must repave a road that 2/3 miles long. How long will it take the crew to repave the road

Respuesta :

kirablake7
kirablake7 kirablake7
  • 10-03-2020
It would take 12 hours to repave the road.
Answer Link

Otras preguntas

a six sided die was rolled nine times . what is the mode of these rolls 4 5 1 2 4 3 6 2 4
During the California Gold Rush of the 1850s, some Americans in the eastern part of the United States reached California by sailing all the way around South Am
Simplify the expression.   5^0 A.0  B.0.5  C.1  D.50
How would I draw a model to find the quotient of 2.4 divided by 3.  What is this quotient ?
A measure of output per unit of input such as labor is called ______.
what continent does a moose live on?
physical form in which a substance can exist
Which plot structure is found commonly in fairy tales, folk tales, and myths?
distance of 45 km with the modernist speed of 20 km per hour is
How did people survive before agriculture was discovered