engineeringplus engineeringplus
  • 10-07-2020
  • Business
contestada

Project A has cash flows of $4000, $3000,&0 and $3000 for years 1 to 4 and project B has cash flows $2000,$3000,2000,$3000 for years 1 to 4

Respuesta :

queenkeyara15
queenkeyara15 queenkeyara15
  • 10-07-2020

Answer:

Project X has both a higher present and a higher future value than Project Y.

Explanation:

Hope this helps :)

Answer Link

Otras preguntas

Easton won best of show in 60% of the shows he entered. In how many shows was Easton entered if he won 15 times last year?
X=y+6 X+6y=20 Solving systems of equations using substitution
What is the vertex of an acute angle?
Which condition causes ocean salinity to increase? A. ocean water flowing into rivers B. high levels of evaporation C. increased fish populations D. meltin
Which Virginian refused to sign the U.S. Constitution, but was the chief supporter of the Bill of Rights?
Is 48/100 closest to 0,1/2, or 1 explain
Which occurs at a transform boundary? A. Two plates spread apart B. One plate collides with another head-on C. One plate sinks beneath another D. One plate
If you know the perimeter of the square, you can find the area of the square in two steps. Describe the two steps.
what has shaped much of a landscape along the North European Plain
I NEED HELP IN MATH:Jackie ran fifty yards at an average speed of 21 feet per second. What was her average speed in feet per minute? A.1,260 B.7,560 C.1.75 D.0.