rabindrashrestha320 rabindrashrestha320
  • 13-02-2021
  • Mathematics
contestada

b) Kiran can do 1/8part of a work in 6 days. How much work does he do in
(i) 1 day
(ii) 4 days?​

Respuesta :

angstar4
angstar4 angstar4
  • 13-02-2021
1/8 per 6 days

x per 1 day
1/8 divided by 6/1
1/8 times 1/6
1/48 of the work in 1 day

1/48 times 4 days
4/48 or 1/12 of the work in 4 days
Answer Link

Otras preguntas

When creating the final version of your action plan all of the following are true EXCEPT: A. all of the goals that you created for yourself are realistic and ca
James added a new video card and needs to get a power supply that will have enough power to run the new card. When researching the new power supply, what featur
How did Alexander Hamilton's and Thomas Jefferson's views toward the interpretation of the Constitution differ?
I need help with #4 pleaseee
Solve the equation 12a3 + 12a2 = -3a. Show all work.
How far apart should your hands be when using a power grip?
Identify the scale factor used in each dilation. 17.
Nancy Stone has a small company and has negotiated a special rate for rental cars when she and other employees take business trips. The maximum charge is $45.00
identify the detail that best illustrates "The bear" is a farce Smirnov Challanges popova to a duel Smirnov agrees to teach Popova how to fire a gun Popova call
A 1.25 g sample of an unknown gas at 39 ∘ C and 1.05 atm is stored in a 1.35 L flask. What is the density of the gas?