abelmulugeta19 abelmulugeta19
  • 11-10-2021
  • Computers and Technology
contestada

consider 4 jobs arriving in ready queue in the same order at time =0 if BT requirements of these jobs are 4,1,8,1 respectively what is completion time of p1 assuming round robin with TQ =1

Respuesta :

marietavukadinovic marietavukadinovic
  • 11-10-2021

Answer:tq we

Explanation:

t rhh

Answer Link

Otras preguntas

write 4.51 in expanded form
Benito rune 1/10 of a mile each day. Which shows how to find the number of days it will take for Benito to run 3/5 of a mile
England and France: A) were at war with each other but supported shipping rights of neutral nations B) were greatly effected by the Embargo act of 1807 C) impre
Which property of nervous tissue is fundamental to its function of coordinating the body's activities?
A ph of 10 is how many times as basic as a ph of 7
given g (1,2) and k (8,12) what does it mean to find the point p on gk such that 3 (GP) = 2(PK)
What are corporate taxes used for in the united states?
Where does the bonding of two elements take place?
What was the weight percent of water in the hydrate before heating? Put answer in one decimal place. weight of water 0.349 weight of hydrate 2.107
The u.s., britain, and france thought the best way to handle germany after the war was to