briannahowell2797 briannahowell2797
  • 10-11-2021
  • Mathematics
contestada

For 31 hours of work, you are paid $240.25. How much would you receive for 40 hours?

Respuesta :

ilana35 ilana35
  • 10-11-2021
310

240.25/31= $7.75 an hour
7.75 x 40=$310
Answer Link
MayaalWpp MayaalWpp
  • 10-11-2021
310 because you divide 240.25 by 31 and get 7.75. Then you subtract 40-31 and get 9 and multiply 9x7.75 and get 69.75. Lastly you add 69.75 and 240.25 and get 310. Hope that helps.
Answer Link

Otras preguntas

Put the steps below into the correct order to show how to begin managing your time well.
Type the correct answer in the box. Spell all words correctly. Jason was part of a team that had to calculate the incoming solar radiation and outgoing terrestr
Why is it weird that we have so many coal deposits in cold regions of the earth?.
Highlight all the words that make up the complete subject of the sentence. In the morning, the dog barks to wake Hagrid up.
What is the volume of 1 mole of gas at Standard Temperature and Pressure (STP)?
Which of the following is equivalent to 0. 71 mL? A. 0. 00071 L B. 0. 0071 L C. 71 L D. 710 L.
SOMEONE PLEASE HELP ILL MARK AS BRAINLIEST AND GIVE 5 STARSSSSS
The Red Shell's flight path is modeled by the equation: y = -2x2 + 60x + 350 a) Factor the equation below: olutions to the equation?
A garden table and a bench cost $659 combined. The garden costs $91 less than the bench. What is the cost of the bench?
hi pls help answer this!