Every network has at least one critical path.
a. True
b. False

Respuesta :

Kalahira
Kalahira Kalahira
  • 24-01-2018
True and it is the longest path of a network diagram. The critical path can be found through the sequence of project activities that add up to the longest overall duration.
Answer Link

Otras preguntas

How do geographers determine the locations of places?
Camille placed blocks on a table in rows and columns. All the rows and columns had the same number of blocks in them and formed a square. Which could be the tot
evaluate 6x for each value of x. x = 2/3
What is 1,632 in word form?
A security camera rotates 30° every 10 seconds. How long does it take the camera to rotate 360°?
How many light years are in 1 second?
Butter melts when you heat it in a pan on the stove. Is this a chemical change or a physical change? How can you tell?
A security camera rotates 30° every 10 seconds. How long does it take the camera to rotate 360°?
Which of the following ratios is not equivalent to the ratio 5/6  Explain10/12, 13/14, 15/18, 25/30
a meter is one thousandth of a kilometer. write an equation to show the relationship between 962 meters and 0.962 kilometers.