gabbygarciaanay6629 gabbygarciaanay6629
  • 11-01-2018
  • Health
contestada

The most realistic estimate of the time required to complete an activity is referred to as​ what?
a. slack time
b. optimistic time
c. most likely time
d. pessimistic time

Respuesta :

sydneybottom
sydneybottom sydneybottom
  • 11-01-2018
I would say B. optimistic time
Answer Link

Otras preguntas

gaps in the spacings of orbital semi-major axes of asteroids in the asteroid belt, produced by dynamical resonances with nearby planets, especially Jupiter has
What organized structure is used here
If the Grievance Committee concludes potentially unethical conduct may have occurred, a. they conduct a hearing to determine whether the Code has been violated.
How have the traditions and beliefs of indigenous peoples, Africans, and Europeans shaped society and culture in Central America and the Caribbean?
Write a report of no less than 250 words describing the characteristics of the early church. Emphasize both similarities and differences as compared to the chur
help please ineed this
the most powerful ice breaker in the world was built in the former soviet union.The ship is almost 150 m long, and its nuclear engine generates 56 MegaWatts (56
pls ans my question interested girl come 15++ come fast​
13/6=y/3 I need to know how to solve it
Write a paragraph that compares Act 1, Scene 5 of Romeo and Juliet and Hillingford' painting Romeo and Juliet meeting at the Capulets' Ball, analyzing what is e