duncanreleford
duncanreleford duncanreleford
  • 12-03-2018
  • Physics
contestada

determine the quantity of work done when a crane lifts a 100-n and block from 2 m above the ground to a 6 m above the ground

determine the quantity of work done when a crane lifts a 100n and block from 2 m above the ground to a 6 m above the ground class=

Respuesta :

lidaralbany lidaralbany
  • 07-02-2019

Answer: 400 J

Explanation :

Given that,

Force = 100 N

Distance  = 6 m - 2 m = 4 m

Now , the work done is equal to the multiplication of the force and distance.

W = F * d

[tex]W = 100\ N\times 4\ m[/tex]

[tex]W = 400 J[/tex]

Hence, the quantity of work done is 400 J

Answer Link

Otras preguntas

Sue removes the plug from a trough to drain the water inside. The volume, in gallons, in the trough after it has been unplugged can be modelled by 4t^2-32t+63,
59 is the sum of 24 and Mabel's height
What is 18/30 in simplest form?
Which of the following diseases can be spread through saliva?
Where do new genes come from
What's the best way to respond to conflict?
What type of chord forms when a musician strikes multiple adjacent keys simultaneously? polychord fourth chord tone cluster triad
Evaluate b – 2a – c for a = –3, b = 9, and c = –6
Which factor best explains why classification systems change over time? A. changing environments lead to reclassification B. increased plant species leads to re
Help me please, thank you